Free EV installer tools
Check the electric service and sketch the permit drawing. Sign up to save, brand and attach them to jobs.
For houses with an ADU, duplexes, triplexes and fourplexes that share one electric service.
Unit 1
Unit 2
FAIL — 214.5 A of 200 A
Method: NEC 220.82 per dwelling · Dwellings 39,480 VA + charger 12,000 VA at 125%.
Verify inputs and your local code edition; the inspector makes the final call.
Want printable diagrams, panel labels, AI panel photo reading and the NEC copilot?
Try AmpCRM — $9.98/month